Rinnai Gas To Daikin CO2 Heat Pump Changeover In Middle Park
A Rinnai instantaneous gas hot water unit changed over to a Daikin CO2 split heat pump arrangement with the storage tank in a narrow passage and the outdoor unit at roof level.
A Split Heat Pump Arrangement Across Two Equipment Positions
This Middle Park changeover replaced a wall-mounted Rinnai instantaneous gas hot water unit with a Daikin CO2 split heat pump hot water system.
The supplied photographs show the original unit, its removal, the storage tank positioned in the narrow side passage and the separate outdoor unit at roof level during installation.
Changing From Instantaneous Gas To Heat Pump Hot Water
The customer was installing solar panels and a battery and wanted to move the home toward all-electric operation. The hot water work changed the existing wall-mounted Rinnai instantaneous gas unit to a Daikin CO2 heat pump system. This project record does not claim that the home's entire electrification work was completed by this hot water changeover.
Why Daikin And A Split Arrangement Were Used
Daikin was selected largely because it was a familiar and trusted brand for the customer. The confirmed arrangement used the RQWX60ZV1A 4 kW CO2 heat pump unit, TU32SSZA 315 L stainless steel cylinder and Wi-Fi control. The split arrangement allowed the cylinder to use the narrow side passage while the outdoor unit was positioned at roof level for suitable airflow.
The Changeover In Pictures
- 01
Existing System
The starting point was the wall-mounted Rinnai instantaneous gas hot water unit in the narrow side passage.
- 02
Removal And Preparation
The existing gas unit was disconnected and removed from the wall.
- 03
New System Installed
The Daikin storage tank was positioned in the passage and the separate outdoor heat pump unit was installed at roof level to provide suitable airflow.
Before And During The Changeover
Daikin Split Heat Pump Equipment Positioned
The existing Rinnai instantaneous gas unit was removed. The Daikin storage tank was positioned in the side passage and the separate outdoor heat pump unit was installed at roof level, where limited ground-level space restricted airflow.
The system was filled and leak-tested, operation was tested, and the Wi-Fi controller was set up and connected to the customer's Wi-Fi.
Heat Pump Hot Water Work in Middle Park
This gas-to-heat-pump hot water changeover was carried out in Middle Park.
View Middle Park on Google MapsIndicative Budget For A Similar Installation
$6,000Indicative, including GST and after applicable rebatesAll amounts include GST.This owner-supplied amount is an indicative budget for similar Rinnai instantaneous gas to Daikin CO2 split heat pump changeovers. It is not the disclosed invoice total for this completed project, a fixed quote or a suburb average.
Rebates and eligibility: The indicative amount is after applicable rebates. Eligibility and certificate values depend on the property, existing system, selected equipment and current program rules.
Check Current Heat Pump Rebate Eligibility
Heat pump hot water incentives may reduce the upfront cost of an eligible changeover. The programs and certificate values available depend on the property, existing system, selected equipment and current rules, so eligibility must be assessed for each installation.
Check Your Rebate EligibilityWho takes care of the rebates?
Veeken Plumbing can guide customers through the applicable rebate process and explain the information or approvals required. Program administrators make final eligibility decisions, and historical project figures are not a universal entitlement.
System Checks And Wi-Fi Setup
The system was filled and checked for leaks. Operation was tested, and the Daikin Wi-Fi controller was set up and connected to the customer's Wi-Fi.
Services Related To This Project
Hot Water Systems
Hot water repairs, servicing, replacements and installations for homes, businesses and managed properties, including heat pump, electric, gas and continuous flow systems.
Heat Pump Hot Water
Heat pump hot water installation, replacement, repairs and servicing with practical advice on system suitability, positioning, rebates and ongoing maintenance.