Description
[vc_row][vc_column][vc_column_text]
The standard installation price allows for the disconnection of the existing HWS (recessed or free standing), the installation of the new HWS, installation of the temperature/pressure relief valve drain, any necessary alterations to the gas, cold water, hot water connections (using the existing gas cock, duo valve & concrete slab) and the commissioning of the new HWS.
[/vc_column_text][/vc_column][/vc_row]








Reviews
There are no reviews yet.